Tender For corrigendum : procurement of neutralgroundingresistance (ngr) system for 33/11 kv power transformer at main receiving substation for chasnalla colliery.
Tender For supply of front end nose cone bracket suitable for vande bharat train set version-02. one setconsist of following items- (1) transition brackets for train-18 nosecone coupler as per icf drawing no-train18/dtc/ac-1-0-209 (2) side bracket assy. for train-18 nosecone coupler as per icf drawing no. train18/dtc/ac-1-0-148 alt-a (3)transition bracket arrgt. for train-18 nosecone exterior panel as per icf drawing no- train18/dtc/ac-1-0-126 alt-b (except item 1 to 11). note-material and specification should be as per given drawings. a test certificate for the material required at the time of delivery from nablaccredited/certified lab. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of new power transformer 24/31.5 mva and 11/132 kv and neutralgroundingresistance , two-year mandatory spares (1 set) , removal of old transformer, oltc panel& ngr and erection, testing & commissioning charges for new tr
Tender For supply and installation of neutralgroundingresistance (ngr) system in the secondary of 315kva, 3.3kv-550v transformer in the r.j. unit and nj unit at bahula colliery under kenda area
Tender For supply of front end nose cone bracket suitable for vande bharat train set version-02. one setconsist of following items- (1) transition brackets for train-18 nosecone coupler as per icf drawing no-train18/dtc/ac-1-0-209 (2) side bracket assy. for train-18 nosecone coupler as per icf drawing no. train18/dtc/ac-1-0-148 alt-a (3)transition bracket arrgt. for train-18 nosecone exterior panel as per icf drawing no- train18/dtc/ac-1-0-126 alt-b (except item 1 to 11). note-material and specification should be as per given drawings. a test certificate for the material required at the time of delivery from nablaccredited/certified lab. [ warranty period: 30 months after the date of delivery ]
Tender For manufacturing transportation and erection of bellmouth with transition zone 1 and transition zone 2 manufacturing and transportation of trash rack panel and lifting beam for trash rack panel and its embedment which includes material labour handling